Cargo facts
- Exact product name and intended use
- Photos, quantity, value and HS code if known
- Packed dimensions, gross weight and CBM
- Battery, liquid, powder, magnet, gas or temperature limits
Before pickup is booked
Use this checklist to prepare a complete inquiry, confirm responsibility at each handoff and keep the evidence needed through delivery.
Pre-shipment cargo checklist
Not every shipment needs the same service, but every quotation needs accurate cargo and delivery facts.
What you receive before booking
The quote should make the next decision easier—not leave key details for later.
Mode, scope, estimated timing and key exclusions shown side by side.
Origin, freight, destination and special-handling items separated clearly.
Dimensions, weight, packing, value, documents and carrier acceptance checked.
Supplier, warehouse, carrier, customs and delivery responsibilities mapped before pickup.
Photos, loading records and delivery notes captured where they protect you.
If the plan changes, receive the reason, impact and next workable option.
FBA, appointments, liftgate, upstairs handling, pallet return and access limits confirmed.
Lessons on damage, space, time and supplier performance improve the next shipment.
For a faster first reply
Product photos, packed dimensions, gross weight, supplier location, destination and required date let us begin comparing workable options.
Decision summary
| Decision | Evidence to request | What the answer changes |
|---|---|---|
| Can the cargo and supplier meet the plan? | Product specification, packed dimensions, weight, value, supplier location and readiness date. | Feasible modes, pickup plan and quotation scope. |
| Where can loss, delay or rejection occur? | Packing photos, declarations, test documents, labels, access limits and handling points. | Carrier acceptance, insurance, packaging and delivery controls. |
| Who owns each handoff? | Named supplier, warehouse, forwarder, customs and consignee responsibilities. | Milestones, evidence capture and exception response. |
Buyer questions
Short answers to the questions that usually remain after the first review. Final requirements still depend on the actual cargo, supplier, carrier and destination.
Name one decision owner who confirms product acceptance, packing, quantities, documents, carrier acceptance and delivery assumptions before pickup—not several parties assuming another has checked.
Stop when cargo identity, critical quality, dangerous-goods acceptance, packing integrity, quantity or required documents remain materially uncertain. A missed cutoff is usually cheaper than an unaccepted or failed shipment.
Capture labeled product and lots, internal protection, closed cartons or crates, dimensions and weight, pallet restraint, marks, loading position and seal, tied to the order and date.